Marine Builders' Risk Vessel Construction Questionnaire

Name of Assured

Address

Telephone

Fax

Email

Website

2. Please provide information about the number of years' experience of management and personnel:

Name Position Number of Years Experience Other Information

3. Has the yard obtained certificates of ISO9000 standards?  Yes  No

If yes, who has issued them?

4. Will the vessel(s) be constructed under the rules of a member of the International Approved Classification Society (IACS)?  Yes  No

If yes, please state which member If no, please explain why not

5. Please provide documentation supporting the measures you have in place for the following: (please mark the relevant box to confirm you have attached them)

Safety Regulations Fire precautions
Loss Prevention Organisation of same

6. Has the management implemented an emergency response plan?  Yes  No

7. Is there a complete ban on smoking at the yard?  Yes  No

If no, please state where smoking is allowed

8. In respect of launching and outfitting at quayside, what measures are being implemented to secure a watertight integrity?

9. Has the yard been surveyed?  Yes  No

If yes, please attach the survey report and fill in the following information:

Who conducted the survey? Date (DD.MM.YY) Type of Survey Survey Report Attached? (please mark the box)

10. Please provide the following information on vessels built at the yard over the last 10 years

Type Size Value (specify currency) Periods of Construction Name of Owner / Buyer

11. Please outline your claims record for the last 10 years, with claims details and measures taken to avoid such claims in the future:

12. Please provide us with a copy of the standard Building Contract, which will be used for the construction, and mark the box to show you have done this:

 

Yard / Vessel Questionnaire

1. Please describe the location of the yard, if possible by attaching a map, and briefly describe the yard's facilities:

2. Is the location of the yard exposed to extreme weather and / or earthquakes and / or hurricanes?  Yes  No

3. Have any such extreme conditions been experienced before?  Yes  No

4. State firefighting facilities / capabilities on site and proximity of nearest public fire station / brigade:

5. Describe the methods of construction and any pre-fabrication facilities and units / modules being built by sub-contractors:



6. Will any of the work require towage of the vessel or modules during the construction?  Yes  No

7. Describe the method / type of launch



8. Are several vessels being built simultaneously?  Yes  No

If yes, what is the maximum number of vessels that can be under constuction at the same time?

9. Will any other type of construction work take place on the construction site, e.g. civil engineering, engine buiding, etc.?  Yes  No

If yes, please describe:


10. Does ship repair work take place at the construction site?  Yes  No

If yes, please advise how this will inflict on the vessels being constructed :


11. Will any work NOT be in steel? e.g. fibreglass, aluminium, wood, etc.  Yes  No